Implementation of a Critical Pathway for Distal Pancreatectomy at an Academic Institution
Authors:
Eugene P. Kennedy, Tyler R. Grenda, Patricia K. Sauter, Ernest L. Rosato, Karen A. Chojnacki, Francis E. Rosato Jr, Bernadette C. Profeta, Cataldo Doria, Adam C. Berger, Charles J. Yeo
Published in:
Journal of Gastrointestinal Surgery
|
Issue 5/2009
Login to get access
Abstract
Objective
This study was designed to identify quantifiable parameters to track performance improvements brought about by the implementation of a critical pathway for complex alimentary tract surgery.
Background
Distal pancreatectomy is among the more complex general surgical procedures. This is primarily due to the possibility of blood loss from visceral vessels, splenic injury, and significant postoperative complications. The introduction of the laparoscopic approach to the distal pancreas has introduced a further level of surgical expertise required to fully address the clinical needs of this diverse patient population. Critical pathways have been one of the key tools used to achieve consistently excellent outcomes at high-quality, high-volume institutions. It remains to be determined if implementation of a critical pathway at an academic institution with prior moderate experience with distal pancreatectomy will result in performance gains and improved outcomes.
Methods
Between January 1, 2003 and August 15, 2007, 111 patients underwent distal pancreatectomy. Forty patients underwent resection during the 34-month period before the implementation of a critical pathway on October 15, 2005 and 71 during the 20 months after pathway implementation. Patients undergoing both open and laparoscopic procedures were included. Peri- and postoperative parameters were analyzed retrospectively to identify those that could be used to track performance improvement and outcomes.
Results
The two groups were not significantly different with respect to age, sex, race, diagnosis, operative blood loss, or mean operative duration. Postoperative length of hospital stay was significantly shorter when comparing pre- to postpathway implementation (10.2 days versus 6.7 days, P ≤ 0.037). The rate of readmission to the hospital after discharge was significantly lower post pathway (25% versus 7%, P ≤ 0.027). Hospital costs were also reduced.
Conclusion
Implementation of a critical pathway for a complex procedure can be demonstrated to improve short-term outcomes at an academic institution. This improvement can be quantified and tracked and has implications for better utilization of resources and overall cost containment while maintaining or improving upon an already high level of care.